Utility
High-power quarter-cell modules for utility-scale arrays, supported by batch testing records, packing specifications and installation guidance.
- Batch traceability is required for plant acceptance.
- Tracker compatibility and mechanical loads must be confirmed.
- Logistics planning determines installation sequence.
- 01
Confirm module format against the tracker supplier's load table.
- 02
Align packing and container plans with construction phases.
- 03
Retain batch inspection records for acceptance documentation.
Comparable configurations.
Utility-scale plant, Latin America
Batch testing records and packing plans were required for plant acceptance and staged construction.
Illustrative project profile

Agrivoltaic pilot, Europe
A pilot array tested elevated mounting with a module surface designed for uniform light distribution.
Illustrative project profile
Start a conversation
Send us the project brief.
Tell us the application, destination market and documentation you need. We will reply with the matching specification and files.
28-402 Xutian Smart Park, Xuelang Street, Binhu District, Wuxi City, Jiangsu Province, P.R.China