Utility-scale plant, Latin America
Batch testing records and packing plans were required for plant acceptance and staged construction.
- Application
- Utility
- Region
- Latin America
- Capacity
- 120 MW
- Series
- TOPCon Utility Series
The plant was built in phases, and the owner required module batches to be traceable to inspection records. Packing plans were aligned with each phase so that unloading equipment could be reused. Mechanical load references for the tracker configuration were reviewed before shipment, and installation guidance was issued to the EPC contractor in advance. Project capacity 120 MW.
Illustrative project profile.
Start a conversation
Send us the project brief.
Tell us the application, destination market and documentation you need. We will reply with the matching specification and files.
28-402 Xutian Smart Park, Xuelang Street, Binhu District, Wuxi City, Jiangsu Province, P.R.China

